TechMC AdvisoryIdea to market, under one roof.
PRIVATE PROJECT INTAKE • RIVIERA FORMWORK / DEVON
Case 188 · TMCA-FW-188 • Version 1.0 • 09 Nov 2026
Guided review · No purchase required

Your slab-edge prop check

Hi Joe and Corey. This page walks you through what Sid and a manufacturer need to see about your prop. Skip anything you don't know. At the end you'll review your answers, download a short report and email it to Sid yourself.

Expected time: 15–20 minutes
No drawings or CAD needed

1. Before we begin

Safety first. These are simple observations of your prototype, not a load test or a temporary-works check.

1 / 7
Do not load-test the prop to failure, stand on it, or work under a live form to take a reading. Take measurements on the ground or on a bench. On site, follow your temporary-works procedures and your temporary works coordinator. Skip anything you are not comfortable doing.

What we understand from your email

A steel slab-edge formwork prop, about 700 mm high: a perforated upright with pin height adjustment, a threaded bar with wing nuts running through a pivot bracket, on a base plate with fixing holes. The aim is less wasted timber when propping slab edges, with a possible scaled-up version as push-pull props for wall systems.

Base plate→Adjustable upright→Threaded push bar→Timber edge form

These are starting notes from the mockups. Please correct anything that is wrong.

No tools? That's fine. A tape measure and bathroom scales cover most of it. Leave anything you don't know blank. An honest blank is more useful than a guess.

2. You and the product

Simple facts about you, the prop and where you want to take it.

2 / 7

3. How it is used on site

Tell us what the prop has to do in real use.

3 / 7

4. The prop itself

What it is made of and how it fits together. Mockup values are fine if no prototype is made yet.

4 / 7

5. Simple checks (only if safe)

Bench or ground checks only. No loading to failure.

5 / 7

How to check

Use a tape measure, bathroom scales and your hand. Do each check at the highest working height, with the bar fully wound out, because that is where play and bending are worst.

Indicative only: the push of fully fluid concrete on the form, shared between props. Real loads also include vibration, people and impacts, so a temporary works designer sets the actual design load.

6. Share visual evidence safely

Cloud links are best (Google Drive, Dropbox, OneDrive). Share only what you are happy to send by email.

6 / 7
Hold back drawings and CAD for now. Sid has sent a mutual NDA. Detailed drawings can follow once it is signed.

7. Next step and consent

You choose what happens next. Nothing is sent from this page.

7 / 7

Privacy and consent

How this page handles your answers

Your answers stay in your browser. This page does not upload them or send email. When you download the report and email it, your email and cloud providers handle what you choose to share. Standard web hosting may keep access logs (including IP addresses).

TechMC uses your report only to look at your enquiry and discuss next steps, never for public case studies or marketing without your separate permission. Detailed drawings and other confidential material only after the mutual NDA is signed.

Next: check your answers, then confirm once more before the report is created. Nothing is sent automatically.

Review your answers once more

Gate 1 of 2: please check the report below. Use “Edit answers” if you want to correct anything.

Review
Would you like to review your answers once more? They're displayed below. You are still in control, and no email has been sent.

Your report is ready

Your report download has been started. Please check your Downloads folder. It has not been emailed.

Ready to email

✓ Thank you, Joe and Corey.

Now send your downloaded HTML report as an attachment to sid@techmcadvisory.com. The email link below opens a draft, but you must attach the report yourself and press Send.

  1. Find the downloaded file named Riviera_TechMC_Prop_Report_….html in Downloads.
  2. Open your email, address it to sid@techmcadvisory.com, and attach that file.
  3. Check cloud link permissions, then press Send.
Submission status: NOT SENT. We cannot confirm delivery from this page. Your email application will handle sending, and you can follow up with Sid if needed.

Sid will read your report and come back with his view and, if useful, a quote for a short technical review with a manufacturer.